Project Scope:

Under cut road, remove unsuitable material, and back fill to grade. Install 6" and 8" water main along roadside. Tap installed water main into existing system. Install multiple concrete storm water structures and pipe. Pour concrete curb and gutter along with sidewalk. Grade ditch and establish grass growth. Asphalt pave Tomasi, prep Calcite for future pavement.

​