When:
Winter 2026
Project Scope:
Pull stamp sand away from breakaway to prevent overflow into shipping channel and into a material stockpile. Build and maintain 5 mile haul road. Load from stockpile into haul trucks, and haul 5 miles down the beach into special location.
​